The muon front-end control electronics of the LHCb experiment
The LHCb muon readout apparatus is made of 1368 Multi-Wire Proportional Chambers (MWPC) and 24 Gas Electron Multiplier (GEM) chambers connected to 7632 16-channel front-end boards, resulting in 122.112 channels to be read out. After a pp collision, all the resulting signals must be read within 25 ns, before the next collision. The large-scale of the system and the time constrains naturally led to